Riding the Cincinnati Bell Connector Streetcar

By: Dennis FurbushPublished: 7 months ago

734 views

6 Likes   1 Dislikes


This streetcar line opened in September 2016 with five streetcars, operating on a 3.6 mile loop in downtown Cincinnati, powered by a single overhead wire.

Related Videos